Welcome FOSHAN  BLOSSOM  HOTEL  SUPPLIES  CO.,LTD.
Company News  
You are here:Home » NEWS » Company News

Stainless steel bathroom cabinet installation method

Time: 2015-01-27 17:44:28     

Because the bathroom space more humid, so many consumers in the selection of bathroom cabinets usually choose stainless steel bathroom cabinet, it is not only excellent moisture resistance, and the appearance of texture is also very good, excellent decorative properties, stainless steel bathroom cabinet has suspended and floor-two categories, the installation method is as follows:


A hanging stainless steel bathroom cabinet installation methods:

1, first check whether the solid core of the wall, can not be installed on a hollow wall, because the hollow wall tension is not enough, not take it will rot.

2, according to the selected hole with percussion drill on the wall, the wall of the expansion pipe fitting into the hole, and then the self-tapping screws to lock the main cabinet and the wall.

3, after the main cabinet is installed, and then into the basin, adjustable flat.

4, side cabinets, shelving installation method with the main cabinet.

5, mirror installation: by mirror back hole punched in the wall installation specifications, into the expansion pipe, then screw into the expansion pipe to fit the depth, hang bath mirror.

6, connected out of the water, and check tightness, clean up the site.

Second, the floor-stainless steel bathroom cabinet installation methods:

1, the main cabinet horizontally, put the foot on the fixing plate screwed.

2, the main cabinet placed in the installation location, ground screw to adjust the level.

3, after the main cabinet is installed, and then into the basin, adjustable flat.

4, side cabinets, shelving installation method with the main bathroom cabinet hanging cabinet.

5, mirror installation: by mirror back hole punched in the wall installation specifications, into the expansion pipe, then screw into the expansion pipe to fit the depth, hang bath mirror.

6, connected out of the water, and check tightness, clean up the site.




�����ر�